SCHEDULES OF PLANNED PREVENTIVE MAINTENANCE CHECKLISTS

Planned Preventive Maintenance checklists , EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED MICROSOFT WORD DOCUMENTS W Weekly M Monthly Q Quarterly SA Semi/Annually A Annually SST Seasonal Start Up SSH Season Shut Down . No Registeration Needed!

EQUIPMENT DETAILS Fan Coil Units FCU preventive maintenance

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2


الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين



Fan Coil Units FCU preventive maintenance


SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan


SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan


do.php?img=179


EQUIPMENT DETAILS Fan Coil Units FCU preventive maintenance

صيانة دورية جداول جاهزة وحدات مروحة ملف تبريد

جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات

EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED

MICROSOFT WORD DOCUMENTS TECHNICAL DATA SCHEDULES

Capacity
Qty: Lot
Make & Model

Location

Fan Coil Units FCU preventive maintenance

Task Description
D / Daily W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes

Item Description
Qty Notes

Critical Tasks to be performed

Generator Monthly Visual Inspection

1- Clean the surfaces of motor and blower
2- Visually inspect the outside and inside of the unit.
3- Examine Motor & blower fan for movement, wear and tear and dust. Remove dust and dirt with a vacuum.
4- Change / clean air filters
5- Lubricate all the moving parts, except the ball bearings.

Other recommended tasks

6- Replace any dry, cracked or worn belts.
7- Check the condition of the motor, disrepair, sounds odd, vibrates or is not operational.
8- Check the room Thermostat.
9- Inspect pipe works, shut of valves and valve actuator for any leaks.
10- Check / clean drain line for free flow.

Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer

proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d


https://www.sitei.net/up/do.php?id=180

or you can download from attachments
No registration required

! في أمان الله



proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D5&hash=acaedc343055116a139b8f0cbf6d6ab6


 

Attachments

Top