الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين
EQUIPMENT DETAILS Sand Filter Units
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS Sand Filter Units
صيانة دورية جداول جاهزة نظام فلتر مركزي رملي فلاتر رمل مرشحات رملية
Capacity
Qty: Lot
Make & Model
Location
Sand Filter Units
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Critical Tasks, to be performed
Operate Manually
Check Pressure gauges for drop in pressure
Check operation control
Check for any leak if necessary replace valves
and fitting
Clean paint piping
Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer
http://www.sitei.net/up/do.php?id=69
في أمان الله !
Attachments
-
117.5 KB Views: 967