1. This site uses cookies. By continuing to use this site, you are agreeing to our use of cookies. Learn More.

EQUIPMENT DETAILS Elevators CONTROLLER

Discussion in 'LIFTS' started by Mannan, Aug 20, 2016.

  1. Mannan

    Mannan Administrator Staff Member



    [​IMG]

    [​IMG]


    الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين


    EQUIPMENT DETAILS Elevators CONTROLLER

    SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan

    SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan


    [​IMG]

    EQUIPMENT DETAILS Elevators CONTROLLER

    صيانة دورية جداول جاهزة نظام مصاعد

    جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات

    EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED

    MICROSOFT WORD DOCUMENTS

    Capacity
    Qty: Lot
    Make & Model

    Location
    Elevators CONTROLLER


    Task Description
    W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
    A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
    2W M 3M
    6M A Notes

    Item Description
    Qty Notes

    Critical Tasks to be performed
    Check operation of reverse phase relay
    Check operation of overload relays
    Check loose connections
    Check deflectors
    Check condition Of condensers, resistors, diodes ,rectifiers and transformers
    Check all moving parts on selector

    Other recommended tasks HOISTWAY

    Check all riding, start shocks, vibration and extra ordinary noise
    Check telephone and alarm bell, operation switches in car
    Check car position and hall position indicator lamps
    Check floor leveling one each floor
    Check door re-opening devices
    Check emergency door key operation
    Check car lighting and fan operation

    Notes
    Use additional sheets if required
    PPM routines based on Complete
    Running hour where recommended by the Manufacturer


    [​IMG]

    http://www.sitei.net/up/do.php?id=109


    ! في أمان الله


    [​IMG]

     

    Attached Files:


Share This Page