    EQUIPMENT DETAILS BIOMEDICAL Fume Cupboard

    SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan

    SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan


    [​IMG]

    EQUIPMENT DETAILS BIOMEDICAL Fume Cupboard

    صيانة دورية جداول جاهزة نظام مصاعد

    جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات

    EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED

    MICROSOFT WORD DOCUMENTS

    Capacity
    Qty: Lot
    Make & Model

    Location
    BIOMEDICAL Fume Cupboard maintenance


    Task Description
    W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
    A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
    2W M 3M
    6M A Notes

    Item Description
    Qty Notes

    Critical Tasks to be performed
    Check condition and operation of air cleaning devices, if installed
    Check all emergency isolators
    Check face velocity
    Check condition and operation of fans
    Check condition and operation of motors
    Check condition and operation of drives , belts
    Check bearings and lubricate where necessary

    Other recommended tasks

    Check condition and operation of wash down facility, if fitted
    Check the fire damper, release mechanism, and replace fusible link, if required
    Check operation of fluorescent lamp
    Check condition and operation of fume cupboard system
    remove baffles and clean both the baffles and the rear of chamber
    clean interior surface of chamber wash with dilute detergent solution
    extract ducting, joints & drain points make up air balance
    Check stability and condition of the discharge stack
    Check the automatic isolator by providing inadequate airflow conditions

    Notes
    Use additional sheets if required
    PPM routines based on Complete
    Running hour where recommended by the Manufacturer